Cross Survey & Consultants has contributed to numerous transportation and infrastructure development projects through planning, design, engineering analysis, and consultancy services.
| S.No | Category | Project Details |
|---|---|---|
| 1 | Work Order Details | Preparation of Detailed Project Report For The Work of “Collection of Data and Preparation of Lps and Alignment For Forming New Link Road and Construction of High Level Bridge In Between Neyyadupakkam – Ilayanar Vellore Village Across Cheyyar River”. |
| 2 | Work Order Details | Preparation of Detailed Project Report For The Work of “Collection of Data and Preparation of Lps and Alignment For Construction of High Level Bridge to Flood Damaged Bed Level Causeway at Km 0/0 – 0/8 of Walajabad – Thirupulivanam Road Across Palar River (ODR)”. |
| 3 | Work Order Details | Consultancy Service for the work of “Construction of Additional High Level Bridge at Km 4/150 – 5/050 of Kanchipuram – Vandavasi Road (SH-116) Across Palar River ”. |
| 4 | Work Order Details | Alignment Proposal For The Work of Formation of Western Bypass to Karamadai Town From Bettathapuram Pirivu at Km 39/10 Of Coimbatore -Mettupalayam - Ooty Gundalpet Road (NH-181) To Thimmapalayam Joining at Km 0/8 of Karamadai- Tholampalayam Road In Coimbatore District. |
| 5 | Work Order Details | Widening From Two Lane Paved Shoulder to Four Lane With Paved Shoulder Km 81/300 - 86/500, Km 88/700 - 90/500, Km 90/900 - 96/300 & 97/900-110/700 Of NH 81 (Old NH-67). |
| 6 | Work Order Details | Formation of Parthibanur Bypass Around Parthibanur Town In Km. 0/0-3/600 |
| 7 | Work Order Details | Forming Approach Road to Rasipuram New Bus Stand at Km 0/053 - 1/650 including Widening of Culverts and Minor Bridges |
| 8 | Work Order Details | Consultancy Service for The work of Formation of Bypass Road to Dindigul Town at Km 2/8 - 11/0 (Phase - I) |
| 9 | Work Order Details | Consultancy Service for The work of Formation of Bypass Road to Dindigul Town at Km 0/0 - 2/8 (Phase - I) |
| 10 | Work Order Details | Formation of Alternate Road to Udhagai, Branching at Km 95/10 of NH181 (Funcity) and Joining at Km 0/2 of Golflinks Road (Fingerpost) Via Manjanakkorai, Fernhill, Kandal at Km 0/0 - 10/850. (Udhagai Kaikatty Road \[MDR\], Palada Lovedale Road \[ODR\], Lovedale Road - Annanagar To Manjanakkorai \[Municipal Road\], Udhagai Avalanchi Kundha Thaishola Road \[MDR\], Fernhill Road \[ODR\], Theetukkal Road - Fernhill To Lakeview Junction \[Municipal Road\], Charringcross Southlake (Via) Lower Bazaar Road \[ODR\] and Brick Field Road - Kandal Mukkonam To Fingerpost \[Municipal Road\] |
| 11 | Work Order Details | Consultancy Service For the Work of “Formation of Attur Bye Pass Road at Km 0/0 –7/3" |
| 12 | Work Order Details | Consultancy Service For the Work of “Formation of Vellore Ring Road Phase I" |
| 13 | Work Order Details | Consultancy Service for the work of Improvements to the Earthen Hill Road for Arulmigu Nainamalai Varadharaja Perumal Temple, Nainamalai, Namakkal Taluk and District for a Length of 7.1km Including Protective Works, Cement Concrete Drain, Cross Drainage Works and Parking Area. |
| 14 | Work Order Details | Widening From Single Lane to Two Lane With Paved Shoulder and Strengthening of Kuttimekkipatti - Edaikaraipalam Road Km 0/0-1/8 and Formation of Road Km 1/8-3/3 to Jallikattu Arena. |
| 15 | Work Order Details | Widening From Two Lane With Paved Shoulder to Four Lane and Improvements at Km 26/5-40/2, Km 42/2-53/2, Km 55/8-56/2, Km 58/7-61/2 and Km 76/6-81/3 of NH 81 and Widening From Two Lane to Four Lane at Km 40/2-42/2, Km 53/2-55/8, Km 61/2-66/7 and Km 67/2-72/4 of NH 81\. |
| 16 | Work Order Details | Alignment Proposal For The Work of “Construction of High Level Bridge at Km 20/6 of Viruthachalam –Pallakollai Road (MDR 746) Across Chinna Nariyan Odai”. |
| 17 | Work Order Details | Alignment Proposal For The Work of “Construction of High Level Bridge at Km 21/6 of Viruthachalam –Pallakollai Road (MDR 746) Across Nariyan Odai”. |
| 18 | Work Order Details | Digitalisation of Highways land records by Conducting Survey by Total Station / Lidar method which includes collection of coordinates of Road geometry, permanent structures, Footover bridges, subways, grade seperators, median, divider, all utilities of line Departments, survey of junctions Trees boundary stones km/hm stones and all signages, all permanent structures abutting roads, Special mention to public buildings (Schools, hospital, bus shelters, etc.) adjoining the road and all water bodies, etc and all other datas required for the departmental engineers and superimposing the collected data with the field maps, including supply and erection of boundary stones at all survey points, and submission of reports as specified by the departmental engineers in the various formats like excel, word, Autocad, Jpeg, Pdf etc., and all others charges including service tax. |
| 19 | Work Order Details | Consultancy Service for Formation of Bypass Road to Dindigul Town at Km 2/8 - 11/0 (Phase - I) |
| 20 | Work Order Details | Consultancy Service for Formation of Bypass Road to Dindigul Town at Km 0/0 - 2/8 (Phase - I) |
| 21 | Work Order Details | Conducting Soil Investigation Survey in Addition to the work of Construction of High Level Bridge across Kedilam River at Km 16/4 of Thirukoilur Sankarapuram Road Branching at Km 1/6 -1/8 (via) Palaapattu - Idayarkuppam Road. |
| 22 | Work Order Details | Preparation of Detailed Report for Reconstruction of High Level Bridge across Buckingham Canal at Km 31/2 - 31/4 of Tindivanam - Marakkanam Road (SH 134). |
| 23 | Work Order Details | Preparation of Detailed Report for "FORMATION OF NORTHERN SIDE BYPASS ROAD TO AVINASHI TOWN AT KM 0/0 TO KM 9/310". |
| 24 | Work Order Details | FORMATION OF ALTERNATE ROAD TO UDHAGAI, BRANCHING AT KM 95/10 OF NH181 (FUNCITY) AND JOINING AT KM 0/2 OF GOLFLINKS ROAD (FINGERPOST) VIA MANJANAKKORAI, FERNHILL, KANDAL AT KM 0/0 - 10/850. (UDHAGAI KAIKATTY ROAD [MDR], PALADA LOVEDALE ROAD [ODR], LOVEDALE ROAD - ANNANAGAR TO MANJANAKKORAI [MUNICIPAL ROAD], UDHAGAI AVALANCHI KUNDHA THAISHOLA ROAD [MDR], FERNHILL ROAD [ODR], THEETUKKAL ROAD - FERNHILL TO LAKEVIEW JUNCTION [MUNICIPAL ROAD], CHARRINGCROSS SOUTHLAKE (VIA) LOWER BAZAAR ROAD [ODR] AND BRICK FIELD ROAD - KANDAL MUKKONAM TO FINGERPOST [MUNICIPAL ROAD] |
| 25 | Work Order Details | WIDENING FROM TWO LANE WITH PAVED SHOULDER TO FOUR LANING FROM KM 30/700 - 39/2, 41/0-43/4, 44/100 - 47/4, 51/0 -55/0 OF NH 209 (NEW NH NO:83) BETWEEN ODDANCHATRAM TO PALANI SECTION AND STRENGTHENING OF KM 30/7 - 34/0, 35/7 - 37/0, 41/0 - 43/4, 45/0 - 45/4, 45/8 - 46/0, 51/0 - 52/0, 52/965 - 55/0 OF NH 209 (NEW NH NO.83) AND WIDENING OF FOOT PATH, CD WORKS & WAY SIDE AMENITIES. |
| 26 | Work Order Details | "FORMATION OF WESTERN BYPASS TO POLLACHI TOWN STARTING FROM ZAMEEN UTHUKULI @ KM 81/0 OF SH 19 TO ACHIPATTI @ KM 26/6 OF NH 83 VIA NALLUR, THALAKKARAI AND R.PONNAPURAM" |
| 27 | Work Order Details | Widening to Double Lane from km 19/10 of Coimbatore-Nagapattinam road (NH-83) to Km 31/2 of Pallladam – Cochin Frontier road (SH-163) via. Mullupadi, Myleripalayam and Chettipalayam (Alternate Route from Pollachi to Coimbatore). |
| 28 | Work Order Details | PREPARATION OF DETAILED PROJECS REPORT FOR THE WORK OF "FORMATION OF ATTUR BYE PASS ROAD AT KM 0/0 – 11/088" |
| 1 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 9/8 - 14/6 of Arcot - Tindivanam Road (SH 5) including Reconstruction and Widening of Culverts, Providing Junction Improvements, Bus Lay Bye and Center Median. |
| 2 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane with Paved Shoulders at Km 107/2 - 108/420, 110/380 - 113/100 & 114/020 - 115/420 and Widening from Two Lane with Paved Shoulders to End to End at Km 108/420 - 109/680 of Chennai - Chittoor - Bangalore Road including Widening of Minor Bridges at Km 111/8(ii), 112/2 and Widening of Culverts at Km 107/4, 6, 115/0 & 115/6. |
| 3 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km.21/6 - 24/2 of Aruppukottai - Perunali - Sayalkudi - Kadugusandai - Mariyur - Valinokkam Road including Reconstruction of CD Works, Construction of Retaining Wall, Centre Median, Bus Lay Bay & Junction Improvements (SH 38). |
| 4 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 26/600 - 36/680 of Arcot - Tindivanam Road including Reconstruction and Widening of Culverts, Providing Junction Improvements, Bus Lay Bye and Center Median. |
| 5 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 23/4 - 30/0 of Kanchipuram Vandavasi Road including Reconstruction and Widening of Culverts, Construction of Drain and Retaining Wall, Providng Junction Improvements, Bus Lay Bye, Paver Blocks and Center Median. |
| 6 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane and Strengthening at Km 12/0 - 19/4 of Thavasi Vallam Road including Reconstruction of Culvert at Km 12/6, 13/4, 13/8, 13/10, 14/10, 15/8, 16/4, 16/6, 16/10, 18/6, Widening of Culvert at Km 17/10, 19/2 and Junction Improvement at Km 12/0. |
| 7 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening From 1/8- 9/750, and Km 10/345 - 15/2, and Widening & Strengthening with Cement Concrete Pavement from Km 0/0 - 1/8 of Cuddalore - Melpattampakkam Road including Reconstruction of Culverts at Km 0/2 (i), (ii), (iii), 0/6 (i), (ii), 0/10, 4/8 and Widening of Culverts at Km 2/4, 3/2,6, 4/2,4, 8/4, 12/2,4, 13/6 (i), (ii), 14/4,10 and Widening of Minor Bridge at Km 8/8 and Construction of Retaining Wall at Km 4/2,8, 8/4. |
| 8 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km 96/6 - 103/6 and Strengthening at Km 103/6 - 104/050 of Villupuram - Pondy - Nagapattinam Road (SHU 215) including Reconstruction of Culvert at Km 97/4, 98/6(i),(ii), 100/4, 101/2, 101/8, 102/2, 102/4, 102/8, 103/2, 103/4 and Construction of Retaining Wall at Km 98/4. |
| 9 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 85/0 - 87/4 of Thoppur - Mettur - Bhavani - Erode Road (SH 20) Including CD Works (Including LA). |
| 10 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 50/0 - 60/4, 61/4 - 62/6, Three Lane to Four Lane at Km 31/0 - 32/4, Km 36/0 - 37/0, Km 41/0 - 41/8, Km 45/2 - 46/4, Km 48/7 - 50/0 & Km 60/4 - 61/4 and Strengthening at Km 31/0 - 32/4, Km 36/0 - 37/0, Km 41/0 - 41/8, Km 45/2 - 46/4, Km 48/7 - 62/6 of Erode - Dharapuram Road including Realignment and Construction of Bridge at Km 53/10, Widening of Minor Bridge at Km 32/4, Widening, Construction and Reconstruction of Culverts, Retaining Wall, Providing Centre Median, Paver Block, Junction Improvements and including LA (SH 83A). |
| 11 | Work Order Details | Consultancy Services for Widening from Three Lane to Four Lane and Strengthening at Km 5/2 - 10/500 of Tiruppur- Vijaymangalam Road including Construction of Culvert at Km 6/2 , Reconstruction of Culvert at Km 9/6, Widening of Minor Bridge at Km 8/8 , Construction of Drain at Km 6/0 - 6/4 & 7/8 - 8/6 and Providing Center Median at Km 5/2 -10/500 (SH 19A). |
| 12 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 34/0 - 37/6 of Kallakurichi Thiruvannamalai Road (SH 6) including Construction of Centre Median, Retaining Wall, Junction Improvement, Reconstruction of Culverts and Minor Bridges. |
| 13 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 39/6 - 51/040 of Thiruvannamalai - Thiyagadurgam Road (SH 9A) including Construction of Centre Median, Retaining Wall, Junction Improvement, Reconstruction of Culverts and Widening of Minor Bridge, Slab Culvert and RCC Box Culvert. |
| 14 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 28/8 - 36/150 of Thirukoilur - Asanur Road including Widening of Culverts, Reconstruction of Culverts and Providing Junction Improvements. |
| 15 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 36/150 - 36/800 of Thirukoilur - Asanur Road including Widening of Culverts, Reconstruction of Culverts and Providing Junction Improvements. |
| 16 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 3/8 - 5/6, 6/4 - 7/2, 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works at Km 4/6, 4/8, 11/4, 14/10, 15/6, 15/8, 16/6, 16/10, Construction of Drain, Retaining Wall and Drain. |
| 17 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 18/6 - 22/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works at Km19/4, 19/8, 20/2, 21/8(i), 21/8(ii) and Construction of Retaining Wall. |
| 18 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 35/2 - 48/2 of Vellimedupettai - Pondy Road (via) Mailam including Widening of Culverts, Construction of Kerb Type Center Median, Junction Improvement & RCC Retaining Wall (SH-136). |
| 19 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane with Paved Shoulder at Km 7/2 - 13/6 of Mohanur - Valayapatty Road including Reconstruction of Pipe Culvert, Construction of Culvert and Widening of Culvert. |
| 20 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 10/0 of Polur Chengam Road including Construction of Centre Median, Protective Wall, Widening & Reconstruction of Culverts, Construction of Culverts, Widening & Reconstruction of Minor Bridge and Junction Improvements. |
| 21 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening from Km 10/0 - 20/0 of Polur - Chengam Road (SH-133) including Construction of Center Median, Construction of Additional High Level Bridge at Km 11/4, Widening of Box Culverts at Km 10/6, 10/8, 11/6, 12/10, 14/8(i), 15/0, 15/10, 16/4, 16/10, 17 /4, 18/2, 18/6,19/2, 19/8 & 19/10, Reconstruction of Box Culverts at Km 10/2, 11/8, 12/8, 13/4, 13/8, 14/6, 14/8(ii), 14/10, 15/4, 17/2, 18/10 & 19/4, Construction of Retaining Wall at Km 14/500 - 14/720 (Both Sides) and Providing Junction Improvements at Km 10/2, 14/8, 15/4 & 18/2. |
| 22 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km.1/2 - 5/2 & 18/0 -18/4 and Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 7/0 - 9/8 & 18/4 - 19/2 of Abdullapuram - Asanampattu - Alangayam - Thirupathur Road (SH 122) including Reconstruction of Culverts, Widening of Culverts, Retaining Wall and Centre Median, Providing Junction Improvements, Bus Lay Byes and Paver Blocks. |
| 23 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 50/8 - 52/2 & 53/2 - 54/8 of Thanjavur- Manamadurai Road (Abandoned NH 226) Urban Stretches at Pudukkottai including Reconstruction of Culverts, Providing Junction Improvements and Construction of Centre Median. |
| 24 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 23/0 - 36/500 of Thirumazhisai - Uthukottai Road (SH-50) including Reconstruction of Box Culvert at Km 23/4,6,10, 24/2,4, 25/6, 27/8, 28/4, 29/8, 30/6, 32/2, Widening of Box Culvert at Km 25/6, 28/8 and Widening of Minor Bridge at Km 27/4. |
| 25 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 3/0 - 7/0 of Kannamangalam - Arni Road including Reconstruction and Widening of Culverts, Construction of Drain, Centre Median and Providing Bus Lay Bays. |
| 26 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 56/0 - 57/3 of Arcot - Tindivanam Road including Widening and Reconstruction of Culverts, Construction of Retaining Wall, Centre Median, Providing Junction Improvements and Bus Lay Bay. |
| 27 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 13/5 - 14/4 and Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 30/0 - 36/8 of Kanchipuram - Vandavasi Road including Reconstruction and Widening of Culverts, Construction of Drain, Retaining Wall, Bus Lay Bay and Providing Branch Road Improvements. |
| 28 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 14/6 - 16/8, 19/8 - 21/6 and Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 16/8 - 19/8 of Arcot Tindivanam Road (SH 5) including Widening of Culverts, Reconstruction of Culverts, Construction of Center Median, Providing Junction Improvements, Bus Lay Bay and Paver Blocks. |
| 29 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 0/0 -1/0 & 1/3 - 4/4 of BHEL Feeder Road (SH-241) including Widening of Limited Use Subway, Widening of Minor Bridge, Reconstruction and Widening of Culverts, Construction of Centre Median, Retaining Wall, Bus Lay Bay and Junction Improvements. |
| 30 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 53/4 - 61/8 & 65/4 - 69/0 of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Tiruchuli - Narikudi - Parthibanoor Road (SH 42) including Reconstruction / Widening of CD Works, Construction of Retaining Wall, Toe Wall, Drain, Centre Median and Junction Improvements. |
| 31 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 47/0 - 52/6 of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Tiruchuli - Narikudi - Parthibanoor Road including Reconstruction / Widening of CD Works, Construction of Toe Wall, Retaining Wall, Breast Wall, Centre Median and Branch Road Improvements (SH 42). |
| 32 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 30/6 - 35/6 of Srivilliputhur - Sivakasi - Virudhunagar Aruppukottai - Thiruchuli - Narikudi - Parthibanoor Road (SH 42) including Reconstruction of CD Works, Widening of CD Works, Construction of Drain, Construction of Toe Wall, Retaining Wall, Centre Median, Junction Improvements and including Land Acquisition. |
| 33 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 35/6 - 44/6 of Srivilliputhur - Sivakasi - Virudhunagar Aruppukottai - Thiruchuli - Narikudi - Parthibanoor Road including Reconstruction / Widening of CD Works, Construction of Toe Wall, Drain, Retaining Wall, Center Median and Junction Improvements (SH-42). |
| 34 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 24/8 - 37 /4 of Watrap - Maharajapuram - Alagapuri - Virudhunagar Road including Reconstruction of CD Works/Widening of CD Works, Construction of Drain, Construction of Toe Wall, Retaining Wall, Center Median & Junction Improvements. (SH-182). |
| 35 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 0/0 - 4/750 of Salem - Ulundurpet Road Abandoned NH-79 (Chinnasalem Town) including Reconstruction and Widening of Culverts, Providing Junction Improvements, Construction of Center Median, Drain and Retaining Wall. |
| 36 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 3/0 - 5/0 and Widening from Two Lane to Four Lane and Strengthening at Km 14/6 - 17/0 & 17/2 - 19/0 and End to End Widening and Strengthening at 17/0 - 17/2 of Kallakurichi - Koothakudi Road including Reconstruction and Widening of Culverts, Construction of Retaining Wall, Center Median and Providing Junction Improvements. |
| 37 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 3/6 - 8/6 and 18/0 - 21/4 of Erode - Karur Road (SH 84) including Widening of Culvert, Reconstruction of Culvert and Providing Junction Improvement. |
| 38 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 19/164 - 24/4, 25/4 - 29/0 & 34/2 - 37/0 of Erode - Perundurai - Kangayam Road (SH 96) including Widening of Minor Bridge, Widening of Culvert, Reconstruction of Culvert, Construction of Culvert, Providing Buslay Bay and Providing Junction Improvement. |
| 39 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 79/140 - 92/610 of Arcot - Villupuram (SH 4) Road including Reconstruction of Box Culvert, Construction of Center Median and Storm Water Drain. |
| 40 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane in Km 6/5 - 9/2 , Widening from Two Lane with Paved Shoulder to Four Lane from Km 9/2 - 10/8 and Strengthening at Km 1/4 - 2/4 and 4/4 - 6/5 of North Coimbatore Maruthamalai Road (SH 167) including Construction and Widening of Culverts, Widening of Minor Bridge, Construction of Storm Water Drain, Providing Footpath and Providing Paver Block and Center Median. |
| 41 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 33/0 - 40/0 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin Road (via) Meenkarai including CD Works, Reconstruction of Box Culverts, Junction Improvements and Construction of Retaining Wall (SH-19). |
| 42 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 60/8 - 66/0 of Omalur - Sankari - Tiruchengode - Paramathi Road including CD Works, Construction of Retaining Wall, Construction of Drain, Providing Centre Median. |
| 43 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 49/6 - 51/8 of Athur - Perambalur Road including Reconstruction of Box Culverts, Construction of Drain, Retaining Wall, Junction Improvements and Construction of Centre Median (SH-157). |
| 44 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 5/2 - 9/075 of Perambalur Bypass Road including Widening of Box Culverts, Construction of Retaining Wall, Junction Improvements and Construction of Centre Median (SHU-182). |
| 45 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 20/0 - 24/0 of Polur Chengam Road including Construction of Centre Median, Reconstruction and Widening of Culverts, Widening of Minor Bridge. |
| 46 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 11/0 of Sathy - Athani - Bhavani Road (SH-82) including Widening of Minor Bridges at Km 5/8, 5/10, 7/6, Reconstruction of Box Culvert and Widening of Slab Culvert and Construction of Drain and Retaining Wall. |
| 47 | Work Order Details | Formation of Link road from Km. 110/2 of Villupuram - Pondy - Nagapattinam Road (SHU-215) to Km 0/8 of Chidambaram-Thandavarayansozhaganpettai Road along the bund of Thillai Amman Odai Km 0/0-2/50 |
| 1 | Work Order Details | Consultancy Services for Widening from 2L to 4L at Km 13/0 - 18/050, Widening from 2L PS to 4L at Km 18/2 - 34/0 and Strengthening at Km 16/2 - 17/4, 25/0 - 28/4 of Avinashi - Mettupalayam Road including Construction of Retaining Wall, Reconstruction of Culvert, Junction Improvement, Widening of Minor Bridge, Culvert, Construction of Drain, Providing Center Median and Land Acquisition. |
| 2 | Work Order Details | Consultancy Services for Widening from 2L PS to 4L at Km 34/0 - 38/2 of Avinashi - Mettupalayam Road including Construction of Retaining Wall, Reconstruction of Culvert, Junction Improvement, Widening of Minor Bridges, Culverts, Construction of Drain, Providing Center Median, Paver Block and Land Acquisition. |
| 3 | Work Order Details | Consultancy Services for Widening from Two Lane Paved Shoulder to Four Lane and Improvements of Coimbatore - Siruvani Road (SH 271\) at Km 7/0 - 12/2 including Widening of Culverts at Km 7/8, 7/10, 8/10, 9/10, 10/4, 11/6, Widening of Minor Bridge at Km 9/6 & 10/6. |
| 4 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 5/4 -9/8 of Arcot - Tindivanam Road (SH 5\) including Widening of Minor Bridge, Reconstruction & Widening of Culverts, Construction of Drain, Retaining Wall, Bus Lay Bay and Paver Blocks, Centre Median, Toe Wall cum Drain and Well Protective Wall. |
| 5 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 15/6 to 21/6 of Aruppukottai - Perunali - Sayalkudi - Kadugusandai - Mariyur - Vallinokkam Road (SH 38\) including Construction of CD Works, Retaining Wall, Centre Median, Bus Lay Bay & Junction Improvements. |
| 6 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 0/0 - 8/1, 8/5 13/0 and Strengthening at Km 0/0 - 1/6, 2/0 - 5/0, 5/2 - 6/0, 6/300 - 6/500, 6/8 - 7/2, 7/4 - 8/100, 8/500 - Consultancy Services for 9/2, 9/4 - 9/8, 10/0 - 10/6, 10/8 - 11/2, 11/4 - 12/0, 12/6 - 13/0 of Avinashi - Mettuppalayam Road (SH-80) including Reconstruction of Box Culvert at Km 2/6, 5/6, 6/2, 9/8, 10/8, 11/10, Construction of Box Culvert at Km 0/6, 2/2,10, 3/2,4, 4/10, Widening of Culvert at Km 0/8, 1/4,6, 3/10, 4/6, 7/8, 12/4, Providing Center Median, Construction of Drain and Retaining Wall at Km 9/4,6 & 10/2 (Including LA). |
| 7 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 45/4-54/4 of Arcot - Tindivanam Road including Reconstruction and Widening of Culverts, Construction of Drain, Providing Bus Lay Bye and Paver |
| 8 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 8/8 -11/4 of Kancheepuram - Thiruvathipuram Road including Reconstruction of Culverts, Widening of Minor Bridge at Km 10/2, Construction of Retaining Wall at Km 8/10 and Junction Improvement at Km 10/4. |
| 9 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 14/4 - 20/0 of Kanchipuram - Vandavasi Road including Construction of Additional New Bridge, Reconstruction and Widening of Culverts, Construction of Drain and Retaining Wall, Providing Junction Improvements and Paver Blocks. |
| 10 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 20/0 - 23/4 of Kanchipuram - Vandavasi Road including Reconstruction and Widening of Culverts, Construction of Drain and Retaining Wall, Providing Junction Improvements and Paver Blocks. |
| 11 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 77/8 - 81/9 of Arcot - Tindivanam Road including Reconstruction and Widening of Culverts, Construction of Retaining Wall and Providing Bus Lay Bay. |
| 12 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 66/0 - 70/6 of Erode - Dharapuram Road including Widening of Minor Bridge at Km 69/10, Reconstruction of Box Culverts at Km 67/2, 67/8, 70/4, Widening of Slab Culverts at Km 68/4, 68/10, 70/6, including Protective Works at Km 68/10 and Providing Centre Median. |
| 13 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 17/4 - 30/890 of Palani - Dharapuram Road including Reconstruction of Box Culverts, Providing Centre Median and Pedestrian Footpath. |
| 14 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 7/0 - 7/6 (Only Widening), Km 7/6 - 8/0, 11/0 - 12/0 & 13/8 - 15/0 of Dindigul Gujiliamparai - Karur Road including Construction of Culvert at Km 7/2, 7/4(i),(ii), 11/8, 14/2, 14/6, 14/8, 14/10, Paver Block, Retaining Wall and Extra Widening for Curves and Bus Lay Bays (SH - 74). |
| 15 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 22/4 - 25/6 of Kallakurichi - Tiruvannamalai Road including Construction of Centre Median, Drain, Retaining Wall, Reconstruction of Culverts, Minor Bridges and Widening of Slab Culvert (SH 6). |
| 16 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 25/6 - 27/6 of Kallakurichi - Tiruvannamalai Road including Construction of Centre Median, Drain, Retaining Wall, Junction Improvement, Reconstruction of Culverts, Minor Bridges and Paver Blocks (SH 6). |
| 17 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 27/6 - 32/0 of Kallakurichi - Tiruvannamalai Road including Construction of Centre Median, Retaining Wall, Junction Improvement, Reconstruction of Culverts and Widening of Slab Culvert (SH 6). |
| 18 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km 11/0 - 14/6 of Kallakurichi - Koothakudi Road including Reconstruction of Culvert at Km 13/10. |
| 19 | Work Order Details | Consultancy Services for Widening from 2L to 4L and Strengthening at Km 4/9 - 12/9, 19/9 - 28/8 of Thirukoilur - Asanur Road including Junction Improvements, Widening of Culverts, Reconstruction of Culvert, Widening of Minor Bridges, Construction of Minor Bridges, Construction of Center Median, Drain, Retaining Wall and Providing Paver Blocks (SH 137). |
| 20 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 0/0 - 8/100 of Kanchipuram Byepass (West) including Widening of Slab Culverts, Construction of Box Culverts, Retaining Wall, Centre Median and including LA at Km 8/450 - 8/700. |
| 21 | Work Order Details | Consultancy Services for Widening from Four Lane to Four Lane with Paved Shoulder and Strengthening in Km 1/8 - 2/8 of Varanasi - Kanyakumari Road (Abandoned NH 7\) (Madurai - Thirumangalam Stretch) (SHU 101\) including Construction of Footpath, Centre Median, CD Works and Laying Paver Blocks. |
| 22 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening in Km 15/0 - 18/4 of Madurai - Alagarkoil - Melur Road including Widening of Minor Bridge at Km 15/2, Reconstruction of Culverts at Km 15/4, 16/10, Construction of Retaining Wall at Km 16/525 - 16/750, 16/10, Junction Improvement at Km 16/6, Bus Lay Bye at Km 15/8. |
| 23 | Work Order Details | Consultancy Services for Widening from 2L To 4l and Strengthening at Km 92/900 - 98/0 of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road (SH 34\) including Widening of Culverts at Km 93/4, 93/8, 93/10(i),(ii), 94/8, 95/2, 95/6, 95/8, 96/6(i), 96/10, Reconstruction of Culvert at Km 93/6, Construction of Retaining Wall at Km 97/550 - 98/0, Providing Junction. |
| 24 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 30/2 - 35/2 of Vellimedupettai - Pondy Road (via) Mailam including Reconstruction of RCC Box Culverts, RCC Storm Water Drain, Construction of Kerb Type Center Median & Junction Improvement, (SH-136) |
| 25 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulder and Strengthening at Km 9/0 - 10/6, 13/8 - 19/3, 20/1 - 21/250 of Mundiyampakkam - Pondicherry Road including Reconstruction of Box Culvert at Km 10/2, 14/8, 16/2, 17/6, 18/2, 18/8, 19/3, 20/2 (SH-203) |
| 26 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulder and Improvements at Km 4/8 - 6/0, 7/0 - 15/0 of Namakkal - Kannanur Road including Providing Junction Improvements, Curve Improvement, Construction of Retaining Wall, Well Protective Wall and CD Works. |
| 27 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 51/650 - 52/6, 53/0 - 60/8, Strengthening at Km 52/6 - 53/0 of Omalur - Sankari - Thiruchengode - Paramathi Road including Junction Improvement, Construction of Drain, Widening of Culverts, Reconstruction of CD Work, Construction of Retaining Wall, Providing Center Median and Paver Block. |
| 28 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 42/0 - 44/6 of Thirumazhisai Uthukottai Road (SH-50) including Widening of Culverts at Km 42/2, 42/4, 42/6 and Widening of Minor Bridge at Km 42/10. |
| 1 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening of Avinashi - Tiruppur - Palladam - Pollachi - Cochin (via) Meenkarai Road at Km 92/750 - 98/200 including CD Works, Protective Works, Construction of Drain and Center Median. |
| 2 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening of Avinashi - Tiruppur - Palladam - Pollachi - Cochin (via) Meenkarai Road at Km 40/6 - 43/6 and 54/8 - 57/1 including CD Works, Protective Works, Construction of Drain and Center Median. |
| 3 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 40/2 - 41/2, 42/0 - 45/4 of Arcot - Tindivanam Road and Thiruvathipuram Bypass Km 0/0 to 3/0 including Construction of Major Bridge, Reconstruction and Widening of Culverts, Construction of Drain and Retaining Wall, Bus Bay and Centre Median. |
| 4 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 61/2 - 72/2 & 74/8 - 77/8 of Arcot - Tindivanam Road (SH-5) including Reconstruction and Widening of Culverts, Construction of Drain, Retaining Wall, Bus Bay & Paver Blocks. |
| 5 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 104/4 -107/2 of Villupuram - Puducherry - Nagapattinam Road including Reconstruction of Box Culvert at Km 104/6, 104/8, 104/10, 105/6, 105/8, 105/10 & 106/6, Construction of Kerb Type Center Median and including Construction of Retaining Wall at Km 105/0 -105/6. |
| 6 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Double Lane at Km 8/0 - 12/0 & 15/4 - 15/7 of Pudupettai - Oraiyur - Karumbur - Paithampadi Road and Reconstruction of Box Culvert at 11/4. |
| 7 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 24/8 - 29/4 of Palladam - Dharapuram Road including CD Works, Drain and Providing Center Median. |
| 8 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 7/2 - 14/615 of Erode Outer Ring Road including CD Works, Retaining Wall and Centre Median (Excluding ROB of 1.00 Km Length). |
| 9 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 39/0 - 41/7 of Erode - Karur Road (SH 84\) including Reconstruction of Box Culvert in lieu of Existing Pipe Culvert at Km 39/4,6,10, 40/2,6,8 & 41/4 and Construction of Protective Works. |
| 10 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane and Strengthening at Km 4/6 - 6/6 of Melpatti Sathgur Road Including Reconstruction of Culverts at Km 5/6(i), 5/6(ii), 6/6. |
| 11 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane and Strengthening at Km 6/6 - 8/6 of Melpatti Sathgur Road. |
| 12 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane and Strengthening at Km 8/6 - 12/2 of Melpatti Sathgur Road including Reconstruction of Culverts at Km 8/10, 9/4, 10/4, 10/8, 11/4(i) & 11/4(ii) and Junction Improvement at Km 12/2. |
| 13 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 37/6 - 41/3 of Kallakurichi Thiruvannamalai Road (SH-6) including Construction of Centre Median, Drain, Retaining Wall, Junction Improvement, Reconstruction of Culverts, Widening of Minor Bridges, Construction of Additional Major Bridge and Providing Paver Blocks. |
| 14 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 6/6 & 8/2 -15/8 of Kallakurichi Thiruvannamalai Road (SH-6) including Construction of Centre Median, Drain, Retaining Wall, Junction Improvement, Reconstruction of Culverts, Widening of Minor Bridges, Construction of Additional Major Bridge and Providing Paver Blocks. |
| 15 | Work Order Details | Consultancy Services for Widening from Multi Lane to Four Lane and Strengthening at Km 39/0 - 45/0 of Erode - Perundurali - Kangeyam Road (SH-96) including Construction of Drain, CD Works, Retaining Wall and Centre Median. |
| 16 | Work Order Details | Consultancy Services for Widening from Two Lane with Paved Shoulders to Four Lane at Km 0/8 to 2/5 of Madurai Palamedu Road including Construction of CD Works, Drain, Retaining Wall, Centre Median, Bus Lay Bye, Junction Improvements and Paver Blocks. |
| 17 | Work Order Details | Consultancy Services for Widening from Multilane to Four Lane and Strengthening in Km 0/0 - 1/0 & Widening from Four Lane to Four Lane with Paved Shoulder and Strengthening in Km 1/0 - 1/8, 2/8 - 3/2 & 4/8 - 6/0 of Varanasi - Kanyakumari Road (Abandoned NH 7\) (Madurai - Thirumangalam Strech) (SHU 101\) including Construction of Footpath cum Drain in Km 0/0 - 1/8, 2/8 - 3/2, 4/8 - 7/0, Centre Median, CD Works and Paver Blocks. |
| 18 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 4/0 - 17/4 of Palani - Dharapuram Road (SH-83) including Widening of Culvert, Construction of Culvert, Center Median, Junction Improvement, Bus Lay |
| 19 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 9/8 - 17/8 of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road (SH-34) including CD Works, Center Median and Junction Improvement. |
| 20 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km 11/0 - 17/0, 19/0 -23/0 and 27/0 -28/8 of Sathyamangalam - Athani - Bhavani Road (SH-82) including Reconstruction of Box Culverts, Construction of Drains and Construction of Minor Bridge at Km 22/4 in lieu of Existing Piped Causeway. |
| 21 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 78/4 - 89/896 of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road (SH-34) Including Reconstruction of CD Works, Widening of Slab Culvert, Construction of Kerb Type Center Median, Drain. |
| 22 | Work Order Details | Consultancy Services for Widening from Two Lane to Two Lane Paved Shoulder and Strengthening at Km 109/0 - 111/0, Strengthening at Km 101/615 - 102/0, 103/0 - 104/540, 107/8 - 109/0 of Tiruchendur - Palayamkottai - Ambasamudram - Tenkasi - Courtallam - Shencottah Road and Reconstruction of Box Culvert at Km101/8, 103/10(i), 103/10(ii) and 109/10. |
| 23 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 26/0 - 28/0 of Manapparai - Thuvarankurichi Road including Widening of Culverts, Widening of Minor Bridge, Construction of Drain, Paver Blocks & Centre Median (SH 71A) |
| 24 | Work Order Details | Consultancy Services for Widening from Intermediate Lane to Two Lane and Strengthening at Km 30/0 - 34/0 of Keelapalur - Pullambadi (via) Thirumalapadi Road including Reconstruction of Culvert at Km 30/2, 30/4 & 31/10. |
| 25 | Work Order Details | Consultancy Services for Widening from Sl to IL and Strengthening at Km 0/0 - 2/0 & 3/8 - 7/0 of Irukkanthurai - Sanganapuram Road including Reconstruction of Culvert at Km 0/6(i), 0/6(ii), 0/10, 1/10, 3/10, 4/2, 4/8, 5/4(i), 5/4(ii) & 5/10. |
| 26 | Work Order Details | Consultancy Services for Widening from SL To IL and Strengthening at Km 0/0 - 2/0 & 3/8 - 7/0 of Irukkanthurai - Sanganapuram Road including Reconstruction of Culvert at Km 0/6(i), 0/6(ii), 0/10, 1/10, 3/10, 4/2, 4/8, 5/4(i), 5/4(ii) & 5/10. |
| 27 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 2/6 - 3/6 of Vridhachalam Tholudur Road (SH-141) including Widening of Minor Bridge at Km 3/2, Construction of Center Median, Retaining Wall, Drain, Paver Block at Builtup Area, Improving Junctions and Buslay Bye. |
| 1 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 3/4 of Mettur - Palakkanuthu - Oddanchatram - Dharapuram - Tiruppur Road (SH37) including Re-Construction of Culvert, Widening of Culvert, Minor Bridge, Construction of Drain, Center Median, Providing Junction Improvement, Bus Lay Bye, Footpath and Paver Block. |
| 2 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 16/72 - 18/0, 20/6 - 21/300 of Mettur - Palakkanuthu - Oddanchatram - Dharapuram - Tiruppur Road (SH37) (Extra Length of 110m) including Re-Construction of Culvert, Widening of Culvert, Widening of Minor Bridge, Construction of Retaining Wall, Construction of Drain, Construction of Center Median, Junction Improvement and Bus Lay Bye including Footpath and Paver Block. |
| 3 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 8/9 - 9/0, 10/0 - 11/0 and 12/0 - 12/4 of Dindigul - Gujiliamparai - Karur Road. (SH-74) |
| 4 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane at Km 6/8 - 9/4 of Madurai Alagarkoil Melur Road including Construction of Drain, Retaining Wall and CD Works. |
| 5 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 13/0 - 15/0 of Vellimedupettai - Pondy Road (via) Mailam including Reconstruction of CD Works, Construction of RCC Drain, Center Median, Retaining Wall and Paver Block. |
| 6 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 0/0 - 6/0 of Palladam - Dharapuram Road including CD Works, Drain and Providing Center Median. |
| 7 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 6/0 - 11/8 of Palladam - Dharapuram Road including CD Works, Drain and Providing Center Median. |
| 8 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 2/0 - 7/0 of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road including Construction of Minor Bridge at Km 4/10 and Construction of High Level Bridge at Km 5/10 and CD Works, Centre Median and Junction Improvements. |
| 9 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 14/0 - 20/0 of Manaparai - Thuvarankurichi Road including Widening of Culverts, Reconstruction of Box Culverts, Construction of Protective Wall, Construction of Drain and Construction of Centre Median (SH 71A). |
| 10 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 20/0 - 25/2 of Manaparai - Thuvarankurichi Road including Widening of Culverts, Reconstruction of Box Culverts, Construction of Protective Wall, Construction of Drain and Construction of Centre Median (SH 71A) |
| 11 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 7/0 -18/4 af Korattur - Thinnanur - Periyapalayam Road including Construction of Minor Bridges, Storm Water Drain, Centre Median and Reconstruction of Culverts. |
| 12 | Work Order Details | Consultancy Services for Urban Improvements - Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 5/9 - 8/0 of Vellore - Ussoor Road including Widening of Culvert at Km 6/8, Junction Improvement, Providing Paver Blocks and Construction of Drain & Centre Median. |
| 13 | Work Order Details | Consultancy Services for Urban Improvements - Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 5/9 - 8/0 of Vellore - Ussoor Road including Widening of Culvert at Km 6/8, Junction Improvement, Providing Paver Blocks and Construction of Drain & Centre Median. |
| 14 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 4/350 of Vridhachalam Bypass Road including CD Works, Construction of Additional Major Bridge (SH 213). |
| 1 | Work Order Details | Consultancy Services for Widening from 2L to 4L and Strengthening at Km 5/0 - 7/8, 8/2 - 11/0 of Mettur - Palakanuthu - Oddanchatram - Dharapuram - Tiruppur Road including Re-Construction of Culvert, Widening of Culvert, Widening of Minor Bridge, Construction of Retaining Wall, Construction of Drain, Construction of Center Median, Junction Improvements and Bus Lay Byes (SH-37) |
| 2 | Work Order Details | Consultancy Services for Widening from 2L to 4L and Strengthening at Km 11/0 - 16/2, 18/0 - 19/4, 20/2 - 20/6 of Mettur - Palakanuthu - Oddanchatram -Dharapuram - Tiruppur Road including Re-Construction of Culvert, Widening of Culvert, Widening of Minor Bridge, Construction of Retaining Wall, Construction of Drain, Construction of Center Median, Junction Improvements and Bus Lay Byes (SH-37) |
| 3 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane with Paved Shoulders and Improvements at Km 23/230 - 24/165, Widening from Four Lane to Four Lane with Paved Shoulders and Improvements at Km 24/880 - 27/0, Strengthening Ramp Portion of ROB in Km 24/165 - 24/274 & 24/660 - 24/880 of Dindigul - Coimbatore - Thimmam - Bangalore Road (Abandoned NH 209\) Oddanchatram Urban Stretch Including Strengthening of the ROB Service Road in Dindigul Side Km 24/165 - 24/360, Widening and Improvements from IL to DL of the ROB Service Road in Palani Side in Km 24/403 - 24/880, Reconstruction and Widening of CD Works, Providing Paver Blocks, Construction of Drain and Retaining Wall. |
| 4 | Work Order Details | Consultancy Services for Widening from Four Lane to Four Lane with Paved Shoulders and Improvements at Km 27/0 - 27/500, Widening from Two Lane to Four Lane with Paved Shoulders and Improvements at Km 27/500 - 30/900 of Dindigul - Coimbatore - Thimmam - Bangalore Road (Abandoned NH 209\) Oddanchatram Urban Stretch Including Reconstruction and Widening of CD Works, Providing Paver Blocks, Construction of Drain and Retaining Wall. |
| 5 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 11/8 - 16/8 of Palladam - Dharapuram Road including CD Works, Drain, Construction of Retaining Wall and Providing Center Median |
| 6 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Improvements at Km 0/0 - 4/0 and Widening from Two Lane to Four Lane and Strengthening at Km 4/0 - 16/0 of Tindivanam - Marakanam Road (SH-134) including Widening and Reconstruction of CD Works, Construction of RCC Drain, Center Median, Providing Bus Lay Bay, Paver Block and Construction of Retaining Wall. |
| 7 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane with Paved Shoulder and Strengthening at Km 16/0 - 18/8, 20/0 - 21/0, 22/0 - 25/0, 28/2 - 31/0 and Widening from Two Lane to Four Lane with Paved Shoulder at Km 18/8 - 20/0, 21/0 - 22/0, 25/0 - 28/2, & 31/0 - 32/0 of Tindivanam - Marakanam Road (SH-134) including Widening and Reconstruction of CD Works, Construction of RCC Drain, Center Median, Providing Bus Lay Bay, Paver Block and Construction of Retaining Wall. |
| 8 | Work Order Details | Consultancy Services for Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 10/2, 25/0 - 30/2 of Vellemedupettai - Pondy Road (via) Mailam including Widening and Reconstruction of CD Works, Construction of RCC Drain, Center Median, Providing Bus Lay Bay, Paver Block and Construction of Retaining Wall. |
| 1 | Work Order Details | Preparation of Detailed Project Report Estimate For The Work of Construction of HLB In Lieu of Existing Causeway at Km 1/2 of Senjeri Hills - Vadachittor (Via) Mettulakshmi Naickenpalayam Road (MDR - 881). |
| 2 | Work Order Details | Preparation of Detailed Project Report Estimate For The Work of Construction of HLB In Lieu of Existing Vented Causeway at Km 1/4 of Aathupollachi - Kaliappagoundanpudur Road and Improvements of Approach Roads (ODR). |
| 3 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 5/4 of Senjerihills – Vadachittor (Via) – Mettulakshmi Naickenpalayam Road (MDR - 881) |
| 4 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 5/6 of Vadachittoor – Chettipalayam Road (MDR 522). |
| 5 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 7/2 of Kattampatti - Koduvai Road (MDR 155). |
| 6 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 7/10 of Kattampatti - Koduvai Road (MDR 155). |
| 7 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway Km 14/4 of Kurichi - Kannammanaickanoor (Via) Nachipalayam Road (MDR 1182) |
| 8 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 47/6 of Avinashi – Tiruppur – Palladam - Pollachi – Cochin (Via) Meenkarai Road. |
| 9 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 47/10 of Avinashi – Tiruppur – Palladam – Pollachi – Cochin (Via) Meenkarai Road. |
| 10 | Work Order Details | Preparation of Detailed Project Report For The Work of Construction of HLB In Lieu of Existing Causeway at Km 49/4 of Avinashi – Tiruppur – Palladam – Pollachi – Cochin (Via) Meenkarai Road. |
| 11 | Work Order Details | Preparation of Detailed Report for Reconstruction of High Level Bridge across Buckingham Canal at Km 31/2 - 31/4 of Tindivanam - Marakkanam Road (SH 134). |
| 12 | Work Order Details | Preparation of Detailed Report For “Formation of Northern Side Bypass Road To Avinashi Town at Km 0/0 To Km 9/310”. |
| 13 | Work Order Details | Conducting Soil Investigation Survey in Addition to the work of Construction of High Level Bridge across Kedilam River at Km 16/4 of Thirukoilur Sankarapuram Road Branching at Km 1/6 -1/8 (via) Palaapattu - Idayarkuppam Road. |
| 14 | Work Order Details | Widening From Two Lane With Paved Shoulder to Four Laning From Km 30/700 - 39/2, 41/0-43/4, 44/100 - 47/4, 51/0 -55/0 of NH 209 (New NH No:83) Between Oddanchatram To Palani Section and Strengthening of Km 30/7 - 34/0, 35/7 - 37/0, 41/0 - 43/4, 45/0 - 45/4, 45/8 - 46/0, 51/0 - 52/0, 52/965 - 55/0 Of NH 209 (New NH No.83) and Widening of Foot Path, CD Works & Way Side Amenities. |
| 15 | Work Order Details | “Formation of Western Bypass to Pollachi Town Starting From Zameen Uthukuli @ Km 81/0 of SH 19 To Achipatti @ Km 26/6 of NH 83 Via Nallur, Thalakkarai and R.Ponnapuram” |
| 16 | Work Order Details | Widening to Double Lane from km 19/10 of Coimbatore-Nagapattinam road (NH-83) to Km 31/2 of Pallladam – Cochin Frontier road (SH-163) via. Mullupadi, Myleripalayam and Chettipalayam (Alternate Route from Pollachi to Coimbatore). |
| 17 | Work Order Details | Widening and Improvements of roads around Palani Arulmigu Dhandayathapani swamy Temple comprising of Dindigul –Coimbatore-Thimmam –Bangalore Road (SHU-108) , Palani Adivaram –Thekkanthottam Road (MD-310), Palani – Palaru - Porundalar Dam Road via Balasamuthiram Road (MD-1150 ), Railway feeder Road, Iduban Itteri Road, Kulathu Bye pass road and Thiruvalluvar Road including Junction Improvements, Construction of foot path cum Drain with handrails, Protective works and Cross Drainage Roads (Highways Roads 5.95 Km and Municipality & Union Road 7.00 Km including Upkeeping for a Period of 60 Months |
| 18 | Work Order Details | “Widening and Strengthening of Km 0/4 -18/740 of NH 209 (New no 83) including Elimination of identified blackspot TN-(02)-547 at Km 1/120 (Ramayanpatty), TN(02) 648 at km 3/600 (Palamrajakkapatty), TN (02)-700 at km 5/790 (Edaiyapatty), TN (02)-345, at Km 6/440 (Muthanampatty), TN (02)-649 at km 7/325 (PSNA College), TN (02)-650 at km 8/270 (Kathirayankulam) and TN (02)-548 at Km 9/270 (MangaraiPirivu) by Permanent remedial measures.” |
Every project undertaken by Cross Survey & Consultants is executed with a strong focus on engineering quality, safety, sustainability, and compliance with national standards.